Not Developed
Concepts Not being considered
1-Baseline Patch and Repair
2A - Campus
3B - Stacked
3E - Flat East of Griffin
F.1 - Lot E + Hall F Reuse
F.2 Lot E
3F.3 - Lot E - Future Expansion – Exhibit Halls on Level 2
3F.4 - Lot E - Future Expansion – Exhibit Halls on Level 0
3G - Former Reunion Arena Site
Concepts Not Developed
The sections below - Concepts Not Developed Further Due to Fatal Flaw and Concepts Not Developed Due to Fatal Flaw - outline options that did not advance and the various reasons why.
2A - Campus
Concept 2A - Campus
Features
Fragmented exhibit hall space
Does not meet Convention Center goal to have a large contiguous exhibit hall to host large shows
3B - Stacked
Concept 3B - Stacked
Map Graphic
Exhibit hall is split on different levels
Does not meet Convention Center goal to have a large contiguous exhibit hall to host large shows
3E - Flat East of Griffin
Concept 3E - Flat East of Griffin
Map Graphic
Omni Hotel is disconnected from the Convention Center
Does not meet goal for Omni Hotel to be adjacent to the Convention Center
3F.1 - Lot E + Hall F
Concept F.1 - Lot E + Hall F Reuse
Map Graphic
Exhibit halls must be located high above grade to clear the Dallas to Forth Worth High Speed Transportation Connection
3F.2 Lot E
3F.2 Lot E
Map Graphic
Conflict with Dallas to Forth Worth High Speed Transportation Connection alignment
Excessively deep exhibit halls
3F.3 Lot E - Future Expansion
Future Expansion - Exhibit Hall on Level 2
Map Graphic
Circulation challenges within the building because of remote Convention Center entrances
3F.4 Lot E - Future Expansion
Lot E - Future Expansion – Exhibit Halls on Level 0
Map Graphic
Convention Center is isolated and difficult to integrate into the city fabric
- Former Reunion Arena Site
Map Graphic
Requires stacked and fragmented exhibit halls